Skip links
SPECIAL TRANSPORT OF DRILLING SETS ACROSS EUROPE

TRANSPORT OF DRILLING SETS ACROSS EUROPE - ROUTE AND DELIVERY.

We transport rotary drilling rigs, peeling rigs and deep foundation equipment through 36+ European countries — Bauer, Liebherr LB, Soilmec, Casagrande, IMT, Klemm. Grease laid, all permits, escort.

We cover all of Europe.
36+ European countries
50+ Set transported
Up to 150t Machine weight
In 2h Response to inquiry
Special transport of drilling rigs · Europe

How we transport drilling rigs across Europe — from loading to your address

Rig model and disassembly condition — that's all you need to tell us. As a rule, the grease (guide) is dismantled and transported horizontally on a special carrier or a separate vehicle. The crawler base goes to the lowbed. Rotary head, rods and tools — separate vehicle. Bauer, Liebherr LB, Soilmec, Casagrande, IMT — all brands, all classes.

Transport bušaće garniture Liebherr LB 36-410 - Stronmet izvanredni prijevoz
Bauer · Liebherr LB · Soilmec · Casagrande

SEND SET MODEL AND ROUTE

Model, guide height and total weight — the data we need to estimate the number of vehicles and the route. You will receive a price and a plan within 2 hours. Free, no obligation.

Transport price

How much does
drilling rig transport?

The cost of transporting a drilling rig depends on six factors. Drilling rigs are multi-component machines — the crawler base, high guide and support equipment require careful planning and usually multiple vehicles. Send model and route — price with no hidden costs.

01

Model, class and weight of the set

Smaller drilling rigs (Bauer BG 15/20, Liebherr LB 16/20, Soilmec SR-30/50): weight 30–60 tons, guide height 15–25 m. Medium class (Bauer BG 28/36, Liebherr LB 28/36): weight 60–100 tons, guide height 25–35 m. Heavy rigs (Bauer BG 40/50+, Liebherr LB 44/46): weight 100–150+ tons, guide height 30–45+ m. Each class carries a different number of vehicles and costs.

02

Guide (grease) and its dimensions

The drill string is the most complex element to transport. 15–45 m high, it must be dismantled and transported horizontally — on a special extension beam or a separate vehicle. The string can be 20–45 m long and weigh 2–4 tons. Its transport requires an extendable trailer or a special trailer for long loads.

03

Number of vehicles for complete transport

A complete drilling rig typically requires 2–5 vehicles: (1) crawler base on a lowbed, (2) guide on an extendable trailer or long load trailer, (3) rotary head and kelly rods separately, (4) tools, extension rods and supporting equipment. We plan each project individually.

04

Route and oversized permits

As a rule, the crawler base of the drilling rig is wider than 2.55 m and higher than 4.0 m on the lowbed. This automatically requires special permits for extraordinary transport in each transit country. We obtain all permits immediately upon order confirmation.

05

Delivery time

We organize standard transport within 48–72 hours. Drilling rigs are critical equipment on the construction site — delay means direct losses. For emergencies — pick-up within 24 hours with priority organization.

06

Supporting equipment and tools

Drilling rigs come with a complete set of equipment: kelly rods, casing pipes, drilling heads (auger, bucket, core barrel), bentonite pumps and mixers. All equipment is organized on a separate vehicle or in combination with other rig equipment.

Send model and route

The specific price arrives within 2 hours. No obligation, no hidden costs, no intermediaries.

Request a price →
What we transport

Vrste BUŠAĆIH GARNITURA
KOJE PREVOZIMO

Prevozimo sve vrste bušaćih garnitura i opreme za duboko temeljenje po Europi — od manjih rotacijskih garnitura za bušene šipove do teških garnitura za kontinuiranu armirano-betonsku dijafragmu (CFA) i razne specijalne metode temeljenja. Bauer, Liebherr LB, Soilmec, Casagrande, IMT, Klemm, Buma, PVE — all brands, all classes.

Rotary drilling rigs Transport rotacijskih bušaćih garnitura Bauer BG Liebherr LB Soilmec SR Casagrande lowbed Europa

Rotary drilling rigs

Bauer BG series (BG 15–BG 50+), Liebherr LB series, Soilmec SR series, Casagrande B series. Weight 30–150 t. The most common type we transport — crawler base, grease and rods separately on 4–15 vehicles.

CFA sets (continuous auger) Transport CFA garnitura Bauer BG Soilmec SF Casagrande kontinuirani auger šipovi Europa

Continuous Pile Assemblies (CFA)

Bauer BG with CFA equipment, Soilmec SF series, Casagrande CFA line. Auger diameter 300–900 mm, mass similar to rotary sets. Transport identical — base + auger and rods separately.

Painting sets and diaphragms Transport garnitura za dijafragme Bauer GB grab Soilmec SC hidrofreza Liebherr HS Europa

Painting sets and diaphragms

Grabene (hydraulic clamshell grab) and hydrofreze (trench cutter) — Bauer GB series, Liebherr HS, Soilmec SC series. Weight 60–120+ t. Especially sensitive for transport. Each transport individually.

Vibrating hammers and hydraulic hammers Transport vibracijskog zabijača hidraulički čekić ICE PVE ABI Junttan Delmag Europa

Vibrating hammers and hydraulic hammers

Vibrating heads — ICE, PVE ICEViber, ABI series. Hydraulic hammers for concrete and steel piles — Junttan, Delmag, IHC Hydrohammer. More compact equipment, 1–2 vehicles per set.

Micro drills and anchor sets Transport mikrobušilice ankerske garniture Klemm KR 806 Casagrande C8 sanacija klizišta Europa

Micro drills and anchor sets

Klemm KR 806/KR 808, Casagrande C8, Buma, Kemroc. Weight 5–25 t — fits on one flatbed trailer. Landslide rehabilitation, tunnel anchors and strengthening of existing building foundations.

Not your case?

Send us the set model — we determine the optimal trailer, calculate the route and coordinate the convoy.

Send inquiry
We cover all of Europe.
36+ European countries
Delivery Without intermediaries
CMR Documentation
24/7 GPS Tracking
Where we operate

Transportation of drilling rigs —
All of Europe

We organize the transport of drilling rigs between all European countries. We coordinate with geotechnical companies, special foundation contractors and EPC projects. The drilling rig on site at the right time — that is our task.

🇩🇪Germany
🇦🇹Austria
🇳🇱Netherlands
🇧🇪Belgium
🇫🇷France
🇨🇭Switzerland
🇮🇹Italy
🇪🇸Spain
🇵🇱Poland
🇨🇿Czech Republic
🇸🇰Slovakia
🇭🇺Hungary
🇷🇴Romania
🇧🇬Bulgaria
🇸🇪Sweden
🇩🇰Denmark
🇳🇴Norway
🇫🇮Finland
🇬🇧UK
🇮🇪Ireland
🇵🇹Portugal
🇬🇷Greece
🇭🇷Croatia
🇸🇮Slovenia
Don’t see your country? We operate throughout Europe.
🔩
Multi-component transport
Base, guide, kelly bars, tools — we coordinate everything as one project.
📍
GPS Tracking 24/7
Truck position in real time — throughout the entire journey across Europe.
🔒
CMR Insurance
Every transport is covered by a CMR consignment note. For high-value cargo — additional cargo insurance.
☎️
One contact
From pickup to delivery — one person coordinates everything.
Naša flota

Prikolice za
svaki teret

blank

Lowboy trailer

Ideal for transporting heavy machinery and equipment that requires front loading — excavators, cranes, combine harvesters, military equipment, industrial machines.

Up to 49 tonnes

Payload capacity

Up to 20 m

Load length

0.87 – 0.95 m

Platform height

2.55 m (extendable to 3 m)

Max. width

3 - 4

Number of axles

Extendable

Hydraulic ramp

blank

Flatbed

Universal trailer for transporting standard loads — industrial equipment, generators, transformers, steel structures.

Up to 36 tonnes

Payload capacity

Up to 20 m

Load length

1.20 - 1.35 M

Platform height

2.55 M

Max. width

3

Number of axles

Front
protection wall

Lashing rings

blank

Lowbed trailer

For long and heavy loads requiring extended length and a low center of gravity.

Up to 48 tonnes

Payload capacity

Up to 28 m

Load length

0.88 – 0.95 m

Platform height

2.55 m

Max. width

3

Number of axles

Telescopic
extension

Hydraulic mechanism

Why it is not the same as any other transport

What constitutes transportation?
different set?

Five technical requirements that are specific to this type of machine.

  • 1

    The leader is never transported upright

    The leader of the drilling rig is 15–45 m high. In the working position, it stands upright. For transport, it is completely dismantled from the crawler base and placed horizontally on a special extension beam or a separate vehicle. No standard trailer will accommodate a vertical leader — a carrier who says otherwise either does not understand or is lying.

  • 2

    Kelly bars are long and heavy

    Kelly rods (telescopic rods for transmitting torque to the drill head) are typically 12–20 m long and 3–8 tons in weight. They require an extendable trailer or a special trailer for long loads. They cannot be transported on a standard semi-trailer.

  • 3

    The crawler base is oversized

    As a rule, the crawler undercarriage of the drilling rig is 3–4 m wide and 3–4 m high on the lowbed. This automatically requires special permits for extraordinary transport in each transit country. We obtain all permits immediately.

  • 4

    The hydraulic system must be properly prepared

    The rotary head and hydraulic cylinders must be empty or properly blocked for transport. Improper securing of hydraulic hoses can cause leaks and contamination. We coordinate the preparation with the operator or service technician.

  • 5

    The order of delivery follows the order of assembly

    On the construction site, the set is assembled in a specific order — the track base must be in place and stable before the guide arrives. We coordinate the order of delivery with the assembly team.

Frequently Asked Questions

Everything you
need to know

How much does it cost to transport a drilling rig from Germany?
Transport bušaće garniture iz Njemačke zavisi od modela i konfiguracije opreme, ukupne mase i dimenzija pojedinačnih komponenti, broja potrebnih vozila, tačne lokacije preuzimanja, relacije i potrebnih dozvola. Manje, srednje i teške bušaće garniture mogu zahtijevati različitu transportnu opremu i više transportnih jedinica, zbog čega se svaki transport planira prema konkretnim zahtjevima. Pošaljite upit za transport bušaće garniture s modelom, podacima o opremi i relacijom kako bismo mogli pripremiti preciznu procjenu.
How many vehicles are needed to transport the entire drilling rig?
A complete rig typically requires 2–5 vehicles: (1) crawler base on a lowbed, (2) guide (fat) on an extendable or special trailer, (3) kelly rods and rotary head separately, (4) tools, casing pipes and associated equipment. The specific number depends on the model and level of disassembly.
Can the leader (fat) be translated upright?
No — a 15–45 m high guide must be completely dismantled from the crawler base and transported horizontally on a special extension beam or a separate vehicle with an extendable trailer. No standard trailer will accommodate a vertical guide.
What is a kelly bar and how is it transported?
Kelly bar is a telescopic bar that transmits the torque from the rotary head to the drilling tool. Length: 12–20 m. Weight: 3–8 tons. Requires an extendable trailer or special long-haul trailer for transport — cannot be transported on a standard 13.6 m semi-trailer.
How long does it take to transport a drilling rig from Germany?
Transport of a smaller set (2–3 vehicles) from Germany to Bosnia or Serbia: 7–10 days total (permits 5–7 days + transport 2–3 days). For larger sets (4–6 vehicles): 10–14 days. We recommend confirming your order as early as possible.
Do you carry Bauer, Liebherr LB, Soilmec and Casagrande sets?
Yes — all brands of drill rigs: Bauer (BG and DC series), Liebherr LB series, Soilmec SR/SF series, Casagrande B/C series, IMT AF series, Klemm, Buma, Watson, Comacchio and all others. We evaluate each rig according to class, guide height and number of vehicles required for transport.
Do you also organize the transport of accompanying tools (casing, auger, bucket)?
Yes — we organize the complete transport of the rig with a full set of equipment: casing pipe, spiral auger, bucket drill heads, core barrel, bentonite pumps, bentonite silo and accompanying equipment. All equipment is planned on separate vehicles or in combination according to dimensions.
What is the difference between a drill rig and a crane?
A rotary drilling rig (or piling rig) is a specialized machine for making bored piles, diaphragms, and foundation elements in the ground. It works by rotating or vibrating into the ground. A crane is a hoist that lifts and moves loads in the air. Both machines have a crawler base and a tall vertical structure — but they are completely different in purpose and method of transportation.
Why choose Stronmet

Common mistakes
in transport
drilling rigs

Here is what happens when you choose the wrong carrier — and how Stronmet prevents each of these problems.

✕

Wrong lead trailer

The carrier does not take into account the length of the guide and comes with a standard trailer. Kelly bars 15 m long and a guide 20 m long do not fit. Transport is delayed, the construction site is waiting, the geotechnical team is paid for nothing.

✓

We plan trailers according to the actual lengths of the guide and kelly bars. Extendable or special trailer for long loads — always right, always the first time.

✕

The guide is not properly dismantled and secured

The guide is not completely separated from the base or is not properly attached to the carrier. It shifts during transport, damaging the guides and hydraulic systems. Repair on site costs days and thousands of euros.

✓

Every loading process is photographed and documented. We coordinate the dismantling with the operator in advance.

✕

Delays without explanation

The set is "on the way somewhere" — the project manager does not know where the equipment is. The geotechnical team is waiting. The hour is charged, the deadlines go.

✓

GPS tracking is active throughout the entire journey. The truck’s position is available at any time. One contact who responds — no searching for the driver, no waiting for a callback.

✕

Unexpected costs on the invoice

Agreed transport price — but the invoice arrives with “additional costs” you were not aware of. Fuel, tunnels, waiting time during loading, “administration”. The final bill is 30–50% higher.

✓

Price agreed in advance — that is the price on the invoice. No fine print, no additional costs. Everything included in the calculation is communicated to you before transport confirmation.

Stronmet eliminates each of these risks — with one single contact.

Request risk-free transport →
Zatražite ponudu

DO YOU NEED TO TRANSPORT
AN EXCAVATOR?

Pošaljite model bagera i rutu — odgovaramo radnim danima od 8:00 - 16:00h.

+000 000 000

Available on working days from 8:00 AM to 4:00 PM.

[email protected]

We respond on the same working day.










    m


    m


    m


    kg



    We respond within 2 hours


    🔒 Your data is secure and we use it exclusively for creating a quote.
    Privacy Policy →


    WhatsApp →

    This website uses cookies to improve your web experience.
    This site is registered on portal.liquid-themes.com as a development site. Switch to production mode to remove this warning.
    See more
    Drag