Industrial & Energy Equipment — Generator

Industrial generator

RiverEN → SarajevoBosnia and Herzegovina
Industrial & Energy equipment
Generator
2025
58.0t
Weight
326 km
Route
7.8×4.2×5.1m
Dim.
2 days
Duration
2
Transit countries
2025
Year

Details project

The industrial generator was transported from the port of Rijeka to the power plant in Sarajevo in 2025. The generator was transported by sea, taken off the ship in the port of Rijeka and transported by land to its final destination. Due to the sensitivity of the equipment, the generator was transported in a full protective metal casing measuring 21 meters in length.

Total route length 326 km passes through 2 countries (HR → BiH). Due to the exceptional cargo height of 5.1 meters, the transport required checking all overpasses and tunnels on the route, as well as coordination with the competent authorities for passage through urban areas. All necessary permits for extraordinary transport were obtained.

The transport was completed within 2 days. Cargo dimensions 7.8×4.2×5.1m, total weight 58.0t, transported on a Faymonville lowbed trailer with 4 axles with GPS tracking and constant communication with the customer.

  • Coordination of unloading with the port operator — Rijeka
  • Inspection of overpasses and tunnels on the route HR → BiH
  • Extraordinary transport permits — HR → BiH
  • Faymonville lowbed trailer 4 axles
  • Real-Time GPS Tracking
  • Communication with the client at every step
  • CMR documentation and cargo insurance

Do you need similar transportation?

Send dimensions and route — we answer in 2 hours.

Request a quote →
This website uses cookies to improve your web experience.
This site is registered on portal.liquid-themes.com as a development site. Switch to production mode to remove this warning.
See more
Drag