Skip links
Project & Special — Steel construction

Potain MDT — Tower crane jib sections

HamburgDE → BerlinDE
Project & Special
Steel structure
2024
14.8t
Weight
289 km
Route
19.2×2.2×1.8m
Dim.
1 day
Duration
1
Transit country
2024
Year

Details project

Transport of lattice steel sections by the jib of a tower crane Potain MDT was completed in 2024 from Hamburg to Berlin. The sections were taken from the crane depot and transported to the active building construction site. The jib sections in the characteristic yellow and black Potain color were stacked next to each other and secured on a Kögel flatbed trailer.

Due to the length of the sections of almost 20 meters, the transport was classified as long-haul transport (Langguttransport) with the required markings and signals in accordance with the German Road Traffic Regulations (StVO). The Scania tractor with Kögel trailer ensured stable and safe transport.

Total route length 289 km takes place within Germany. The transport was completed within 1 day. The total weight of the sections was 14.8t, cargo dimensions 19.2×2.2×1.8m.

  • Loading and unloading coordination — Hamburg to Berlin
  • Permit for the transport of long loads (Langguttransport) — DE
  • Kögel flatbed trailer with prescribed marking
  • Real-Time GPS Tracking
  • Communication with the client at every step
  • CMR documentation and cargo insurance

Do you need similar transportation?

Send dimensions and route — we answer in 2 hours.

Request a quote →
This website uses cookies to improve your web experience.
This site is registered on portal.liquid-themes.com as a development site. Switch to production mode to remove this warning.
See more
Drag